Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet demanding hygiene and production standards. The project encompassed the design, supply, installation and commissioning of advanced HVAC systems across civil, Medium Care (MC) and High Care (HC) https://classifylist.com/story22557284/the-penmann-team-completes-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2