Candidates needed to add their scanned pictures of photograph and signature According to the structure and SC/ST candidates were required to upload the category certificates The Mominpur metro station was planned to become built throughout a 2500 sq. m spot. Nonetheless, the Ministry of Defence objected into the elevated composition, https://railwaykolkata84839.blogsidea.com/39829294/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf