The options also involve a major battery at the positioning, to be sure excess ability may be stored to the night, plus a 220 kV transmission line which will join the project for the North Star sub-station, close to exactly where a completely new a hundred MW solar challenge can https://citypointsolar.com.au/solar-panels/