The 1st park contains a capability of 200 MW though Sandrini II features a capacity of a hundred MW. The full cost of the two projects were not disclosed however, during construction, more than 200 staff have been employed. The assignments are anticipated to see a handful of positions opening https://solarpanelslivermore.sport.blog/