(d) in an effort to be certified into This system, the applicant have to be qualified as in the date it submitted its application and at the time the D/HUB difficulties a call.
d. In paragraph (b)(two): i. Remove the https://minampdc343888.blogadvize.com/37215294/tier-1-supplier-integration-gpo-nj-options